翻訳と辞書
Words near each other
・ Clarion
・ CLARION (cognitive architecture)
・ Clarion (company)
・ Clarion (heraldry)
・ Clarion (instrument)
・ Clarion (magazine)
・ Clarion (programming language)
・ Clarion A. Youmans
・ Clarion Alley
・ Clarion Alley Mural Project
・ Clarion Area High School
・ Clarion Area School District
・ Clarion Chukwura
・ Clarion County Airport
・ Clarion County Career Center
Clarion County Courthouse and Jail
・ Clarion County, Pennsylvania
・ Clarion Events
・ Clarion Girl
・ Clarion Golden Eagles wrestling
・ Clarion Herald
・ Clarion Hotel and Casino
・ Clarion Hotel Post
・ Clarion Hotel, Limerick
・ Clarion Island
・ Clarion Municipal Airport
・ Clarion Project
・ Clarion River
・ Clarion snake eel
・ Clarion Township


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Clarion County Courthouse and Jail : ウィキペディア英語版
Clarion County Courthouse and Jail

The Clarion County Courthouse and Jail is a historic courthouse and jail located in Clarion, Clarion County, Pennsylvania. The courthouse was built between 1883 and 1885, and is a 3 1/2-story, brick Victorian structure with Classical details measuring 78 feet, 8 inches, wide and 134 feet deep. It has a 213 foot tall, 25 feet square, clock tower. The jail was built between 1873 and 1875, and is a half brick / half sandstone building, located behind the courthouse.〔(【引用サイトリンク】 National Historic Landmarks & National Register of Historic Places in Pennsylvania ) ''Note:'' This includes 〕
It was added to the National Register of Historic Places in 1979.〔
==History==
Two earlier courthouse were built on the site, the first was completed in 1843, the second in 1863. Both were built of brick and both were destroyed by fire. The second courthouse burned down on September 12, 1882.〔(【引用サイトリンク】url=http://www.co.clarion.pa.us/about-clarion/history.html#courthouse )
Sixteen contractors bid to construct the current courthouse, with bids ranging between $88,370 and $135,000. P.H. Melvin made the winning bid. Construction started on July 6, 1883 and was scheduled to be completed on November 16, 1884, but actual completion was on October 14, 1885. On January 27, 1885 Melvin was removed as contractor and the three bondsmen became acting contractors, retaining Melvin as superintendent of construction. Total completed cost was $126,936. Melvin later sued the county for $40,000, apparently unsuccessfully, for failure to comply with the contracted conditions.〔
The architect was E.M. Butz of Allegheny, Pennsylvania (now part of Pittsburgh) who designed the building in the Queen Anne style and the supervising architect was D. English of Brockville. Henry Warner of Allegheny painted the frescos. The floor tiling was laid by the Star Encaustic Tile Company of Pittsburgh and the Howard Clock Company of New York supplied the 9-foot diameter clock dial and the 1313 pound bell. A galvanized iron sculpture called the "Lady of Justice", standing 9 feet 11 inches tall on top of the clock tower, is of unknown origin.〔
Changes and renovations to courthouse include:
*1889 - gas illumination of the clock was added
*1923 - electric lighting added
*1977 - complete electrical re-wiring, and
*1981 - a complete exterior renovation
The "Lady of Justice" was restored in 1981. About 25 bullet holes were in the statue and her left arm was missing. The statue was restored by Ranochak & Company of Shelbyville, Indiana with a fiberglass coating and fiberglass backing inside the statue. During the restoration the statue's weight doubled to 250 pounds.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Clarion County Courthouse and Jail」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.